Done - very short step, step 9 likely next weekend
3
Steps 9-11🙂
Put up a wall - fragile pieces so had to be careful! Not 100% lined up in the back corner but still have a ways to go
4
Step 12🙂
Second wall & back bottom…..again fragile. Not sure I put the color piece on the ceiling right, but too late now!
5
Steps 13-18🙂
On Sat did step 13 (potting bench) and on sun did 14-18 (book shelf), got both attached to frame. I may try gluing the bench in preparation of doing the lighting. Needed to be careful but no real frustration
6
Steps 19 & 20😐
Completed lighting/setting up touch switch- works great! Couldn’t follow directions completely cause some of my wires weren’t long enough. Ended up having to use painters tape to prevent some from drooping & while I was able to open the battery case, it is such a tight fit, I couldn’t close it up so used painters tape to keep it closed as well. Honestly will probably make it easier to replace the batteries when needed.
7
Steps 21 & part of 22🙂
Fragile frame pieces made it a little challenging to do the roof but got it done - no other issues
General Discussion
Questions or thoughts about the build overall? To comment on a specific step, tap the comment link on that step above.